Al Noor International School Progress Report
A4 portrait bilingual term report on warm paper: English in Inter Tight reading left to right and Arabic in Noto Kufi Arabic set right to left in mirrored columns, with a deep teal title band, a zebra-striped ten-subject marks table, attendance figures, paired teacher comments and signature lines. Girih ten-point star rosettes in teal and sand gold sit in each corner, formal and calm.
Use this template
What's inside Pages: 1 pageSize: A4 portrait, 1240 × 1754 pxFull resolution export: 2480 × 3508 pxPrint size: About 8.3 × 11.7 in (21 × 29.7 cm) at 300 dpiFonts: Instrument Sans and Noto Kufi ArabicLayers: 98 text layers and 78 shapesColour palette #0e4d4a #b8893b #faf7f1 #1c2422 #5b6663 #f1eadcGood for bilingual school report card Gulf international school term report Arabic English progress report academy assessment summary training certificate of results student transcript page How to make it yours Start with the largest text, the "Days present" layer set in Instrument Sans, and swap in your own words. Then rewrite "Late arrivals" (Instrument Sans) and "Attendance rate" (Instrument Sans) with your details. There are no photos to replace, the design is built from type and shapes. Change the background from #faf7f1 to your own colour, then recolour the accents in #0e4d4a and #b8893b. Export a print-ready PDF for the printer, or a PNG to share online. About grade card templates Report layouts for grades, marks, and progress, clear enough for any classroom.
Tags report-card, school, arabic, bilingual, rtl, uae, girih, teal, gold, education
Similar templates Fatima Al Mansouri Bilingual Marketing Resume (resume, also tagged arabic, rtl, bilingual, uae, girih, teal, also set in Noto Kufi Arabic)Colegio Bilingüe Los Andes Informe de Calificaciones (grade card, also tagged report-card, school, education)Sekolah Cahaya Bangsa Rapor Semester (grade card, also tagged school, education)Willowmere Primary Term One Report Card (grade card, also tagged school, education)Colegio San Marcos Bilingual Report Card (grade card, also tagged school, bilingual)Hikari Juku Cram School Score Report (grade card, also tagged bilingual, education)See every grade card template
Related formats