Puddleby Kindergarten Progress Report

A two page A4 portrait report (1240x1754) on warm cream with deep teal type and marigold accents, a chunky Londrina Solid title and Jost text, and a rain cloud with slanted raindrops over rippling puddle rings drawn as clean line art in the top right corner. Page one lists child details and the seven early years learning areas, each rated Emerging, Developing or Secure with three marigold dots, and page two holds warm narrative comments, next steps for home, a parent comment space and signature lines.
Use this template
What's inside
- Pages: 2 pages
- Size: A4 portrait, 1240 × 1754 px
- Full resolution export: 2480 × 3508 px
- Print size: About 8.3 × 11.7 in (21 × 29.7 cm) at 300 dpi
- Fonts: Jost and Londrina Solid
- Layers: 69 text layers and 107 shapes
Colour palette
Good for
- kindergarten or nursery progress report
- early years term report
- preschool parent update
- childminder learning journal summary
- reception class report card
- after school club feedback form
- swimming or music lesson progress card
How to make it yours
- Start with the largest text, the "Title" layer set in Londrina Solid, and swap in your own words.
- Then rewrite "Child name" (Jost) with your details.
- There are no photos to replace, the design is built from type and shapes.
- Change the background from #fbf7ee to your own colour, then recolour the accents in #24566a and #f0a640.
- Keep the 2 pages you need, duplicate the ones you want more of and delete the rest.
- Export a print-ready PDF for the printer, or a PNG to share online.
About grade card templates
Report layouts for grades, marks, and progress, clear enough for any classroom.
Tags
report card, kindergarten, early years, school, progress report, rain, line art, a4, parents
Similar templates
- Little Acorn Montessori Progress Report (grade card, also tagged report card, progress report, early years, school, a4)
- Willowmere Primary Term One Report Card (grade card, also tagged report card, school, parents, a4)
- Sekolah Cahaya Bangsa Rapor Semester (grade card, also tagged report card, school, also set in Jost)
- Colegio San Marcos Bilingual Report Card (grade card, also tagged report card, school, a4)
- Willowmere Montessori Narrative Progress Report (grade card, also tagged progress report, a4, early years)
- Escola Estadual Ipê Amarelo Boletim Escolar (grade card, also tagged report card, school)
See every grade card template
Related formats